Menu
Duke Energy
Startup of a 40K lb/hr fire tube boiler supplying auxiliary steam for gland seal steam for the facilities steam turbine.
Marathon Oil
Startup of an oil firing rental boiler as well as a supplied DA trailer.
Cedars Sinai Hospital
An upgrade to a PLC-based CCS with parallel positioning,
deviation alarms, O2 trim, and packaged Burner management.
Elite Octane
Oversight of two 150K
lb/hr saturated steam boilers startups.
BUA Sugar
Startup of two
220Klb/hr boilers including burner and fully metered controls, for
natural gas and oil.
Cariboo Pulp and Papers
Oversight and installation of 5 new startup burners and recovery boilers as well as burner tuning and flame scanner sighting.
SASOL Chemical
Burner startup for natural gas and refinery gas, as well as input for the control of varying BTU, valued fuel.
University of Rhode Island
This facilities operation was taken over by NORESCO and upgraded with new equipment. Steam is supplied throughout the entire campus.
ClearSign
ClearSign has installed the ClearSign Core™ technology into three Once Through Steam Generators (OTSG) in central California.
Bayonne Cogeneration
This was one of the first CCGT cogeneration plants in the Northeast. The original developer was Cogen Technologies.
Consolidated Edison of New York
ICC Installed controls and assisted in testing first dual burner Radian Ultra-Low NOx burners in a utility application.
Marin French Cheese
Marin French Cheese's plant boiler facility needed to be replaced as their aging boiler was not capable of meeting capacity requirements and was operating on #2 fuel oil.
E. & J. Gallo Winery
California Boiler was contracted to complete a whole-scale re-build of a watertube boiler including combustion blower replacement & controls upgrade for the largest winery in America.
Pitchess Detention Center
Using this breakthrough technology, Pitchess was able to implement a cost effective, ammonia-free SCR solution that offers superior NOx performance with lower energy requirements than other available technologies.
Performance Sheets, a subsidiary of Orange County Container Group
To help support a new robotic production line, Performance Sheets needed to upgrade their existing boiler system to incorporate more efficient boiler technology.
California Dairies, Inc.
California Boiler proposed using the Power Flame Nova Plus Ultra Low NOx burners coupled with Hurst boilers for California Dairies' new milk and butter processing facility.
Arrowhead Regional Medical Center
In order to keep their operations in compliance with new emissions requirements, Arrowhead contacted California Boiler.
MemorialCare Health System
To retrofit Long Beach Memorial Medical Center's three watertube boilers, California Boiler recommended Power Flame Nova Plus metal mesh burners.
Marin French Cheese
Marin French Cheese's plant boiler facility needed to be replaced as their aging boiler was not capable of meeting capacity requirements and was operating on #2 fuel oil.
E. & J. Gallo Winery
California Boiler was contracted to complete a whole-scale re-build of a watertube boiler including combustion blower replacement & controls upgrade for the largest winery in America.
Pitchess Detention Center
Using this breakthrough technology, Pitchess was able to implement a cost effective, ammonia-free SCR solution that offers superior NOx performance with lower energy requirements than other available technologies.
Performance Sheets, a subsidiary of Orange County Container Group
To help support a new robotic production line, Performance Sheets needed to upgrade their existing boiler system to incorporate more efficient boiler technology.
Arrowhead Regional Medical Center
In order to keep their operations in compliance with new emissions requirements, Arrowhead contacted California Boiler.
ClearSign
ClearSign has installed the ClearSign Core™ technology into three Once Through Steam Generators (OTSG) in central California.
California Dairies, Inc.
California Boiler proposed using the Power Flame Nova Plus Ultra Low NOx burners coupled with Hurst boilers for California Dairies' new milk and butter processing facility.
MemorialCare Health System
To retrofit Long Beach Memorial Medical Center's three watertube boilers, California Boiler recommended Power Flame Nova Plus metal mesh burners.
Duke Energy
Startup of a 40K lb/hr fire tube boiler supplying auxiliary steam for gland seal steam for the facilities steam turbine.
Marathon Oil
Startup of an oil firing rental boiler as well as a supplied DA trailer.
Cedars Sinai Hospital
An upgrade to a PLC-based CCS with parallel positioning,
deviation alarms, O2 trim, and packaged Burner management.
Elite Octane
Oversight of two 150K
lb/hr saturated steam boilers startups.
BUA Sugar
Startup of two
220Klb/hr boilers including burner and fully metered controls, for
natural gas and oil.
Cariboo Pulp and Papers
Oversight and installation of 5 new startup burners and recovery boilers as well as burner tuning and flame scanner sighting.
SASOL Chemical
Burner startup for natural gas and refinery gas, as well as input for the control of varying BTU, valued fuel.
University of Rhode Island
This facilities operation was taken over by NORESCO and upgraded with new equipment. Steam is supplied throughout the entire campus.
Bayonne Cogeneration
This was one of the first CCGT cogeneration plants in the Northeast. The original developer was Cogen Technologies.
Consolidated Edison of New York
ICC Installed controls and assisted in testing first dual burner Radian Ultra-Low NOx burners in a utility application.