Consolidated Edison of New York

Case Study
Consolidated Edison of New York

ICC Installed controls and assisted in testing first dual burner Radian Ultra-Low NOx burners in a utility application.


International Combustion and Controls(a division of California Boiler) Installed controls and assisted in testing first dual burner Radian Ultra-Low NOx burners in a utility application. White Paper was developed and presented to EPRI in 1999 by the manufacturer. 

Accomplishments

  • Upgraded controls to Allen-Bradley based BMS systems on all operating units at W. 59th Street station and installed first SCADA system.
  • Installed Allen-Bradley based BMS systems on all operation units at East River’s South Steam Station.
  • Corrected and improved Westinghouse controls at East 60th Street Steam Station.
  • Corrected and improved Westinghouse controls at Astoria Generating Stations unit 40 and 50.
  • Installed controls and set up Flue Gas Recirculation operation for Astoria Generating Station’s unit 30.
  • Performed annual boiler tuning at these and other ConEdison sites.